| $ |
2. Meter testing ¾ | |
Meter size | |
20 or 25 mm................................................... | 54.00 |
40 or 50 mm................................................... | 114.00 |
75 mm and over............................................. | 220.50 |
3. Minimum fee in respect of turning or cutting off or reduction of the water supply and the restoration of the water supply........................... | 76.50 |
4. (a) Reading of meter...................................... | 7.50 |
(b) Urgent reading of meter........................... | 13.00 |
(c) Electronic lodgment of a combined request for a single statement, reading of meter and orders and requisitions............. | 21.50 |
(d) Electronic lodgment of a combined request for a single statement, urgent reading of meter and orders and requisitions.............................................. | 27.00 |
(e) Lodgment other than under paragraph (c) of a combined request for a single statement, reading of meter and orders and requisitions......................................... | 27.00 |
(f) Lodgment other than under paragraph (d) of a combined request for a single statement, urgent reading of meter and orders and requisitions............................. | 32.00 |
(g) Provision of information other than under paragraphs (a) to (f) involving research or investigation of 15 minutes or more ¾per hour or part of an hour........................ | 27.00 |
5. Fee under section 43A in respect of land on which it is proposed to ¾ | |
(a) construct a new single residential building..................................................... | 57.50 |
(b) alter an existing single residential building at a cost, as assessed by the Corporation, of over $22 500 ¾ per $1 000 of the cost so assessed, up to a maximum of $57.50................................. | 1.15 |
(c) construct or alter a building other than a single residential building, the cost of which construction or alteration the Corporation assesses to be over $22 500, an amount for each $1 000 of the cost assessed ¾ | |
up to $1 000 000...................................... | 1.30 |
over $1 000 000 but not over $10 000 000............................................... | 0.85 |
over $10 000 000 but not over $50 000 000............................................... | 0.45 |
over $50 000 000...................................... | 0.20 |
6. (a) Supply of copy of, or extract from, records or plans (other than those stored in digital format) under section 102(3) of the Water Agencies (Powers) Act 1984 ¾ | |
A1 film...................................................... | 13.20 |
A1 paper.................................................... | 10.45 |
A2 paper.................................................... | 8.25 |
A3 paper.................................................... | 7.15 |
A4 paper................................................... | 7.15 |
(b) Additional fee (A4 only) for facsimile transmission | 4.40 |
7. Re-sealing of private fire service connection under by-law 98(5).......................................... | 62.15 |
8. Fee for relocation of water supply connection (less than 500 mm) ¾ | |
(a) where the connection size is ¾ | |
20 mm..................................................... | 108.00 |
25 mm...................................................... | 128.00 |
40 mm..................................................... | 168.00 |
50 mm...................................................... | 218.50 |
(b) other sizes, an amount equal to the actual cost of relocation. | |
9. (a) Fee for fixing a meter under by-law 77(3) | 227.00 |
(b) Fee for assessing a meter under by-law 77(5).............................................. | 162.00 |
(c) Fee for assessing a meter and fixing a new meter under by-law 77(6)................. | 211.00 |
10. Fee for installation of temporary building standpipe.............................................................. | 95.70 |
11. Fee for inspection of work under by-law 87F ¾ | |
(a) single residential building........................ | 41.25 |
(b) other than single residential building ¾single storey............................................. | 63.25 |
(c) other than single residential building ¾more than one storey ¾ fee per floor...... | 105.05 |
12. Fee for book of forms of ¾ | |
(a) notice and certificate of completion and compliance............................................... | 19.25 |
(b) multi-entry plumbing certificate.............. | 7.15 |
13. Fees for authorisation of materials, fittings and fixtures ¾ | |
(a) application ¾ | |
(i) first item of product type............... | 400.40 |
(ii) each additional item of product type................................................. | 55.55 |
(b) examination, testing, inspection or evaluation (per hour or part of an hour)... | 93.50 |
14. Minimum fee for application for disconnection or reconnection of water supply under by-law 96 ¾ on redevelopment or subdivision.. | 108.50 |