Aboriginal Heritage (Marandoo) Act 1992

Reprint 1: The Act as at 14 November 2003


Guide for using this reprint

What the reprint includes

Endnotes, Compilation table, and Table of provisions that have not come into operation

1.Details about the original Act are shown in the Compilation table in endnote 1, at the back of the reprint. The table also shows any previous reprint.

2.A table of provisions that have not come into operation, to be found in endnote 1a if it is needed, lists any provisions of the Act being reprinted that have not come into operation and any amendments that have not come into operation. The full text is set out in another endnote that is referred to in the table.

Notes amongst text (italicised and within square brackets)

Editorial notes show if something has been omitted under the Reprints Act 1984 s. 7(4) (because, although still technically part of the text, it no longer has any effect).

The text of anything omitted can be found in an earlier reprint (if there is one) or the Act as passed.

Reprint numbering and date

1.The reprint number (in the footer of each page of the document) shows how many times the Act has been reprinted. For example, numbering a reprint as “Reprint 3” would mean that the reprint was the 3rd reprint since the Act was passed. Reprint numbering was implemented as from 1 January 2003.

2.The information in the reprint is current on the date shown as the date as at which the Act is reprinted. That date is not the date when the reprint was published by the State Law Publisher and it is probably not the date when the most recent amendment had effect.

 

 

 

Reprinted under the Reprints Act 1984 as

at 14 November 2003

Aboriginal Heritage (Marandoo) Act 1992

CONTENTS

1.Short title1

2.Commencement1

3.Disapplication of Aboriginal Heritage Act 19721

Schedule 12

Schedule 23

Schedule 35

Notes

Compilation table7

 

 

Crest

Reprinted under the Reprints Act 1984 as

at 14 November 2003

Aboriginal Heritage (Marandoo) Act 1992

An Act concerning the application of the Aboriginal Heritage Act 1972 and for related purposes.

1.Short title

This Act may be cited as the Aboriginal Heritage (Marandoo) Act 1992 1.

2.Commencement

This Act shall come into operation on the day on which it receives the Royal Assent 1.

3.Disapplication of Aboriginal Heritage Act 1972

(1)The Aboriginal Heritage Act 1972 does not apply to any place that is on land described in Part 1 of Schedule 1, Part 1 of Schedule 2, or Part 1 of Schedule 3, or to any object situated on or under any of that land.

(2)The reference in subsection (1) to the Aboriginal Heritage Act 1972 includes a reference to any condition imposed or other thing done under that Act before the commencement of this Act.

(3)Nothing in the Government Agreements Act 1979 or any Government agreement within the meaning given to that expression by that Act affects the operation of this Act.

Schedule 1

Part 1 — Portion of Temporary Reserve 5623H (“the TR”)
and construction camp

Windell Locations 122 and 130 but excluding the land described in Parts 2 and 3.

Part 2 — Thoongarie Burial Site Complex (PO 6725)

The land enclosed by a line starting at a point 2 014 metres at 119° 48′ from the south‑west corner of Windell Location 122 on the south boundary of Windell Location 122 and extending

163 metres at 29° 48′

300 metres at 119° 48′

then at 209° 48′ to a point on the south boundary of Windell Location 122

(true bearings) then back along that boundary to the starting point.

Part 3 — Land surrounding Barndayn (Bunjima Pool) 
(PO 0164)

So much of Windell Location 122 as is on the land enclosed by a line starting at a point on the south boundary of Windell Location 122 with AMG coordinates of E621 168.57 N7 490 867.17 and extending successively to points with AMG coordinates

E621 594.96 N7 492 138.78

E623 965.26 N7 491 343.98

E623 753.19 N7 490 711.52

E624 871.49 N7 489 268.65

E624 656.80 N7 488 833.80

then back to the starting point.

Schedule 2

Part 1 — Infrastructure corridor

Windell Location 121 and the land enclosed by a line starting at Latitude 22° 24′ 28″ South and Longitude 117° 41′ 9″ (a point about 9.5 km at 285° from Red Hill) and extending

16 391.9 metres at 106° 53′ 12″

2 872.1 metres at 140° 0′ 56″

4 021.2 metres at 98° 35′ 01″

5 660.3 metres at 133° 34′ 04″

4 505.7 metres at 182° 32′ 41″

5 624.1 metres at 133° 55′ 08″

3 150.9 metres at 90° 00′ 00″

7 964.5 metres at 101° 35′ 31″

1 450.4 metres at 180° 00′ 00″

3 800.9 metres at 270° 00′ 00″

4 356.7 metres at 283° 56′ 59″

3 730.3 metres at 270° 00′ 00″

7 334.5 metres at 313° 55′ 09″

4 498.3 metres at 2° 32′ 38″

4 118.6 metres at 313° 34′ 09″

4 151.5 metres at 278° 26′ 01″

7 025.6 metres at 290° 37′ 56″

9 036.7 metres at 287° 49′ 37″

(true bearings) then back to the starting point, but excluding the land described in Part 2.

Part 2 — Portion of Mount Bruce Aboriginal Site
(PO 4344)

The land enclosed by a line starting at a point 3 670 metres at 100° 38′ 00″ from the north‑west corner of Windell Location 122 and extending

2 950 metres at 300° 11′ to a point on Windell Location 121 boundary

then along that boundary 3 670 metres at 100° 38′ to a point on Windell Location 121 boundary

then along that boundary 750 metres at 119° 35′ to a point on Windell Location 121 boundary

then 770 metres at 209° 35′ to a point on Windell Location 121 boundary

then 425 metres at 270° 00′ to a point on the TR boundary

then along that boundary 194 metres at 299° 35′ to a point on Windell Location 121 boundary

(true bearings) then back to the starting point.

Schedule 3

Part 1 — Power line route

The land enclosed by a line starting at a point 2 947.42 metres at 239° 33′ 12″ from Control Station MD 15 on the north boundary of Section 3 of Miscellaneous Licence 4 issued under the Mining Act 1978 and extending

1 160.76 metres at 51° 38′ 55″

930.29 metres at 90° 00′ 00″

4 158.28 metres at 16° 46′ 42″

2 845.69 metres at 73° 40′ 02″

2 389.22 metres at 41° 05′ 44″

3 516.3 metres at 62° 55′ 29″

5 004.38 metres at 1° 56′ 50″

3 000.88 metres at 90° 00′ 00″

3 962.71 metres at 67° 07′ 27″

2 216.73 metres at 134° 01′ 12″

4 433.81 metres at 247° 26′ 53″

2 750.8 metres at 270° 00′ 00″

900.26 metres at 180° 00′ 00″

600.18 metres at 270° 00′ 00″

2 900.86 metres at 180° 00′ 00″

3 937.23 metres at 244° 24′ 41″

2 565.23 metres at 221° 31′ 20″

2 604.05 metres at 250° 14′ 33″

4 267.77 metres at 196° 03′ 21″

1 420.45 metres at 270° 00′ 00″

438.43 metres at 235° 13′ 20″

(true bearings) then back to the starting point, but excluding the land described in Part 2.

Part 2 — Rock Art Complex (PO 5757)

The land enclosed by a line starting at a point 100 metres at 0° 00′ 00″ from a point with AMG coordinates of E587 800 N7 492 900 and extending

100 metres at 90° 00′ 00″

200 metres at 180° 00′ 00″

200 metres at 270° 00′ 00″

200 metres at 0° 00′ 00″

(true bearings) then back to the starting point.

dline

 

Notes

1This is a reprint as at 14 November 2003 of the Aboriginal Heritage (Marandoo) Act 1992. The following table contains information about that Act and any reprint.

Compilation table

Short title

Number and year

Assent

Commencement

Aboriginal Heritage (Marandoo) Act 1992

2 of 1992

7 Feb 1992

7 Feb 1992 (see s. 2)

Reprint 1: The Aboriginal Heritage (Marandoo) Act 1992 as at 14 Nov 2003

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

By Authority: JOHN A. STRIJK, Government Printer