Energy Operators (Powers) Act 1979

Energy Operators (Electricity Retail Corporation) (Charges) By-laws 2006

 

Energy Operators (Electricity Retail Corporation) (Charges) By-laws 2006

CONTENTS

1.Citation1

2.Commencement1

3.Terms used1

4.Electricity charges2

5.Application of residential tariffs2

6.Meter rental2

7.Fees3

8.Payment3

9.Rebates and reduced fees4

10.Calculation of charges5

11.Changes in rates5

12.Prescribed rate of interest for s. 62(16) of the Act5

Schedule 1  Supply charges

1.Tariff L1 (general supply — low/medium voltage tariff)7

2.Tariff L3 (general supply — low/medium voltage tariff)7

3.Tariff M1 (general supply — high voltage tariff)8

4.Tariff R1 (time of use tariff)8

5.Tariff R3 (time of use tariff)9

6.Tariff S1 (low/medium voltage time based demand and energy tariff)9

7.Tariff T1 (high voltage time based demand and energy tariff)10

8.Standby charges11

9.Tariff A1 (residential tariff)12

10.Tariff B1 (residential water heating tariff)13

11.Tariff C1 (special community service tariff)13

12.Tariff D1 (special tariff for certain premises)14

13.Tariff K1 (general supply with residential tariff)15

14.Tariff W1 (traffic light installations)15

Schedule 2 — Street lighting

Schedule 3  Meter rental

Schedule 4  Fees

Notes

Compilation table21

Provisions that have not come into operation21

Defined Terms

 

Energy Operators (Powers) Act 1979

Energy Operators (Electricity Retail Corporation) (Charges) By‑laws 2006

1.Citation

These by‑laws are the Energy Operators (Electricity Retail Corporation) (Charges) By‑laws 2006 1.

2.Commencement

These by‑laws come into operation on 1 April 2006.

3. Terms used

In these by‑laws, unless the contrary intention appears —

corporation means the body established by the Electricity Corporations Act 2005 section 4(1)(c);

dwelling means a house, flat, home unit or other place of residence used solely for residential purposes;

half‑hourly maximum demand means the maximum demand in kilowatts recorded during the accounting period concerned in any period of half an hour;

off peak means any period other than on peak;

on peak means the periods between 8.00 a.m. and 10.00 p.m. Monday to Friday;

RBA cash rate means the percentage (or maximum percentage) specified by the Reserve Bank of Australia as the Cash Rate Target;

residential tariff means Tariff A1 or B1;

Tariff followed by a designation means the tariff so designated in Schedule 1;

unit, in relation to a charge for electricity, means one kilowatt hour.

[By‑law 3 amended in Gazette 30 Mar 2009 p. 970.]

[3A.Deleted in Gazette 26 Mar 2010 p. 1136.]

4.Electricity charges

(1)The charges to be paid by consumers for electricity supplied by the corporation are those specified in, or calculated in accordance with, Schedule 1.

(2)The charges to be paid by consumers for street lighting supplied by the corporation are those specified in Schedule 2.

5.Application of residential tariffs

(1)A consumer is entitled to be supplied on the basis of a residential tariff only if — 

(a)the premises supplied consist of a dwelling; and

(b)the supply is not used for any industrial, commercial, business, or general purpose.

(2)Notwithstanding that any premises would not otherwise be treated as a dwelling for the purposes of this by‑law, a residential tariff may be applied if the premises or any part of the premises is independently supplied and separately metered solely for the purpose of a residential supply.

6.Meter rental

(1)A consumer supplied by the corporation with electricity is liable to pay the rental specified in Schedule 3 in respect of each subsidiary meter used to meter the supply.

(2)Sub‑bylaw (1) does not apply to a consumer if —

(a)the premises supplied consist of a dwelling;

(b)the supply is not used for any industrial, commercial, business, or general purpose; and

(c)the master account is supplied under a residential tariff.

7.Fees

The fees specified in Schedule 4 are payable in respect of the matters specified in that Schedule.

8.Payment

(1)In this by‑law —

relevant period means —

(a)in the case of a consumer to whom the Code of Conduct for the Supply of Electricity to Small Use Customers applies, the period ending on the due date for payment as specified by the corporation; and

(b)in any other case, the period of 14 days after payment is requested by the corporation.

(2)A consumer supplied by the corporation must pay the appropriate charges specified in the Schedules within the relevant period.

(3)Subject to the Act section 124(4a), if payment of a charge exceeding $1 000 is not made in full within the relevant period, the consumer must pay an additional amount by way of interest for each day that the charge remains unpaid at a rate that is equal to the RBA cash rate as at that day increased by 6 percentage points.

(4)An amount payable under sub‑bylaw (2) or (3) is recoverable in any court of competent jurisdiction as a debt due to the corporation.

[By‑law 8 amended in Gazette 30 Mar 2009 p. 970.]

9.Rebates and reduced fees

(1)In this by‑law —

eligible person means a person who satisfies the corporation that the person holds —

(a)a — 

(i)Health Care Card;

(ii)Commonwealth seniors health card; or

(iii)Pensioner Concession Card,

issued by the Department of Social Security of the Government of the Commonwealth;

(b)a Repatriation Health Card, issued by the Department of Veterans’ Affairs of the Government of the Commonwealth, that indicates on it that the person is totally and permanently incapacitated, a war widow or a dependant; or

(c)a Seniors’ Card issued by the Office of Seniors’ Interests of the Government of the State.

(2)Where electricity is supplied to a consumer who is an eligible person, for use at his or her principal place of residence and the consumer is charged on the basis of Tariff A1, the consumer is entitled to a rebate equal to the fixed charge payable under that tariff for that residence.

(3)Where a consumer who is charged on the basis of Tariff A1 for electricity supplied by the corporation satisfies the corporation that electricity supplied to the consumer has been delivered to and used at premises occupied by an eligible person as his or her principal place of residence, the consumer is entitled to a rebate equal to the fixed charge payable under that tariff for those premises.

(4)Where a fixed charge is payable for multiple dwellings and there is a dwelling in respect of which the rebate is not payable, for the purposes of ascertaining the amount of the rebate payable the amount of the fixed charge payable in respect of the first dwelling shall be taken to relate to a dwelling in respect of which a rebate is not payable.

(5)A person who comes within paragraph (a) or (b) of the definition of eligible person in sub‑bylaw (1) and who is entitled to a rebate under this by‑law is also —

(a)exempted from payment of the account establishment fee specified in Schedule 4 item 1; and

(b)entitled to pay the reduced meter testing fee specified in Schedule 4 item 6(b).

10.Calculation of charges

(1)Where a charge per unit specified in Schedule 1 depends on the number of units consumed per day the charge per unit is to be based on the average daily consumption in the accounting period.

(2)Where a charge calculated in accordance with a Schedule is an amount which is not a whole number multiple of 5 cents the amount is to be rounded up or down, as the case may be, to the nearest whole number multiple of 5 cents.

11.Changes in rates

Where during any accounting period a change in the applicable rate of charges occurs, the charge payable may be adjusted by reference to the date on which the change is to take effect or by reference to the date on which the change is applied to any applicable account, whichever results in the lower charge.

12.Prescribed rate of interest for s. 62(16) of the Act

(1)In this by‑law —

interest period means the period in respect of which payment is made or credit is given.

(2)For the purposes of section 62(16) of the Act, the rate at which interest is to be paid, or given credit for, by the corporation is —

(a)the rate that is equal to the RBA cash rate for the interest period; or

(b)if there is more than one RBA cash rate for the interest period — the rate that is equal to the average of the RBA cash rates for that period.

[By‑law 12 inserted in Gazette 30 Mar 2009 p. 970‑1.]

 

Schedule 1  Supply charges

[bl. 3, 4(1) and 10(1)]

[Heading inserted in Gazette 30 Mar 2009 p. 983.]

1.Tariff L1 (general supply — low/medium voltage tariff)

(1)Tariff L1 is available for low/medium voltage supply.

(2)Tariff L1 comprises —

(a)a fixed charge at the rate of 32.98 cents per day; and

(b)a charge for metered consumption at the rate of —

(i)21.6753 cents per unit for the first 1 650 units per day; and

(ii)19.5586 cents per unit for all units exceeding 1 650 units per day.

(3)Tariff L1 is available subject to the condition that the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be less than 50 megawatt hours per annum.

[Clause 1 inserted in Gazette 30 Mar 2009 p. 983; amended in Gazette 26 Mar 2010 p. 1136.]

2.Tariff L3 (general supply — low/medium voltage tariff)

(1)Tariff L3 is available for low/medium voltage supply.

(2)Tariff L3 comprises —

(a)a fixed charge at the rate of 34.5527 cents per day; and

(b)a charge for metered consumption at the rate of —

(i)22.704 cents per unit for the first 1 650 units per day; and

(ii)20.4928 cents per unit for all units exceeding 1 650 units per day.

(3)Tariff L3 is available subject to the condition that the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be 50 megawatt hours or more per annum.

[Clause 2 inserted in Gazette 30 Mar 2009 p. 983‑4; amended in Gazette 26 Mar 2010 p. 1136.]

3.Tariff M1 (general supply — high voltage tariff)

(1)Tariff M1 is available for consumers supplied at 6.6 kV, 11 kV, 22 kV or 33 kV or such higher voltage as the corporation may approve.

(2)Tariff M1 comprises —

(a)a fixed charge at the rate of 34.5527 cents per day; and

(b)a charge for metered consumption at the rate of — 

(i)21.9354 cents per unit for the first 1 650 units per day; and

(ii)19.7005 cents per unit per day for all units exceeding 1 650 units.

[Clause 3 inserted in Gazette 30 Mar 2009 p. 984; amended in Gazette 26 Mar 2010 p. 1136.]

4.Tariff R1 (time of use tariff)

(1)Tariff R1 comprises —

(a)a fixed charge at the rate of $1.3521 per day; and

(b)an energy charge consisting of — 

(i)an on peak energy charge at the rate of 23.7328 cents per unit; and

(ii)an off peak energy charge at the rate of 7.3197 cents per unit.

(2)Tariff R1 is available subject to the following conditions —

(a)the consumer agrees to take the tariff for a minimum period of 12 months;

(b)the consumer pays the fee set out in Schedule 4 item 11;

(c)the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be less than 50 megawatt hours per annum.

[Clause 4 inserted in Gazette 30 Mar 2009 p. 984‑5; amended in Gazette 26 Mar 2010 p. 1136.]

5.Tariff R3 (time of use tariff)

(1)Tariff R3 comprises —

(a)a fixed charge at the rate of $1.6257 per day; and

(b)an energy charge consisting of — 

(i)an on peak energy charge at the rate of 28.4628 cents per unit; and

(ii)an off peak energy charge at the rate of 8.7624 cents per unit.

(2)Tariff R3 is available subject to the following conditions —

(a)the consumer agrees to take the tariff for a minimum period of 12 months;

(b)the consumer pays the fee set out in Schedule 4 item 11;

(c)the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be 50 megawatt hours or more per annum.

[Clause 5 inserted in Gazette 30 Mar 2009 p. 985; amended in Gazette 26 Mar 2010 p. 1136.]

6.Tariff S1 (low/medium voltage time based demand and energy tariff)

(1)Tariff S1 is available for low/medium voltage supply.

(2)Tariff S1 comprises —

(a)a minimum charge at the rate of $349.1133 per day; and

(b)a demand charge at the rate of 88.6765 cents per day multiplied by —

(i)the on peak half‑hourly maximum demand; or

(ii)30% of the off peak half‑hourly maximum demand,

whichever is the greater; and

(c)an energy charge consisting of —

(i)an on peak energy charge at the rate of 12.6877 cents per unit; and

(ii)an off peak energy charge at the rate of 8.0271 cents per unit.

(3)Tariff S1 is available subject to the following conditions —

(a)the consumer must agree to take the tariff for a minimum period of 12 months;

(b)the power factor must be 0.8 or better during the on peak period.

(4)The corporation reserves the right to levy a charge of 41.06 cents per day per kVAR for the kVAR necessary to improve the power factor to 0.8 lagging in any period during which the power factor at the time of the consumer’s maximum demand is less than 0.8.

[Clause 6 inserted in Gazette 30 Mar 2009 p. 985‑6; amended in Gazette 26 Mar 2010 p. 1136-7.]

7.Tariff T1 (high voltage time based demand and energy tariff)

(1)Tariff T1 is available to consumers supplied at 6.6 kV, 11 kV, 22 kV  or 33 kV or such higher voltage as the corporation may approve.

(2)Tariff T1 comprises —

(a)a minimum charge at the rate of $475.6062 per day; and

(b)a demand charge at the rate of 83.792 cents per day multiplied by —

(i)the on peak half‑hourly maximum demand; or

(ii)30% of the off peak half‑hourly maximum demand,

whichever is the greater; and

(c)an energy charge consisting of —

(i)an on peak energy charge at the rate of 12.2507 cents per unit; and

(ii)an off peak energy charge at the rate of 8.1475 cents per unit.

(3)Tariff T1 is available subject to the following conditions —

(a)the consumer must agree to take the tariff for a minimum period of 12 months;

(b)it applies to a consumer who owns all equipment except tariff metering equipment on the load side of the consumer’s high voltage terminals;

(c)the power factor must be 0.8 or better during the on peak period.

(4)The corporation reserves the right to levy a charge of 41.06 cents per day per kVAR for the kVAR necessary to improve the power factor to 0.8 lagging in any period during which the power factor at the time of the consumer’s maximum demand is less than 0.8.

[Clause 7 inserted in Gazette 30 Mar 2009 p. 986‑7; amended in Gazette 26 Mar 2010 p. 1136‑7.]

8.Standby charges

(1)Standby charges are applicable to consumers with their own generation and supplied on Tariff L1, L3, M1, R1, R3, S1 or T1 and are payable in addition to those tariffs.

(2)In the case of Tariff L1, L3, R1 or R3, the standby charge is 5.72 cents per day per kW based on the difference between total half‑hourly maximum demand and normal half‑hourly maximum demand.

(3)In the case of Tariff M1, the standby charge is 5.10 cents per day per kW based on the difference between total half‑hourly maximum demand and normal half‑hourly maximum demand.

(4)In the case of Tariff S1, the standby charge is 5.72 cents per day per kW based on — 

(a)the difference between total half‑hourly maximum demand and normal half‑hourly maximum demand; or

(b)the difference between total half‑hourly maximum demand and registered half‑hourly maximum demand,

whichever is less.

(5)In the case of Tariff T1, the standby charge is 5.10 cents per day per kW based on — 

(a)the difference between total half‑hourly maximum demand and normal half‑hourly maximum demand; or

(b)the difference between total half‑hourly maximum demand and registered half‑hourly maximum demand,

whichever is less.

(6)The normal half‑hourly maximum demand is to be assessed by the corporation and is to be based on loading normally supplied from the corporation’s supply.

(7)Notwithstanding the corporation’s assessment, in any accounting period the normal half‑hourly maximum demand is taken to be not less than — 

(8)The total half‑hourly maximum demand is to be assessed by the corporation as the consumer’s expected half‑hourly minimum demand on the corporation’s system without the consumer’s generation equipment in operation.

(9)The difference between total half‑hourly maximum demand and normal half‑hourly maximum demand is not to exceed — 

(a)the capacity of the consumer’s generation equipment; or

(b)the expected maximum loading of such generation equipment, as assessed by the corporation.

(10)The provision of a standby service is subject to the following conditions —

(a)the consumer must pay for the cost of all additional mains and equipment necessary to provide the standby service;

(b)the standby service agreement must be for a minimum period of 12 months;

(c)the consumer must give 6 months notice in writing to the corporation of intention to terminate the standby service agreement.

[Clause 8 inserted in Gazette 30 Mar 2009 p. 987‑9.]

9.Tariff A1 (residential tariff)

(1)Tariff A1 is available for residential use only.

(2)Tariff A1 comprises —

(a)a fixed charge at the rate of 34.7537 cents per day or, for multiple dwellings supplied through one metered supply point, a fixed charge at the rate of —

(i)34.7537 cents per day for the first dwelling; and

(ii)26.9847 cents per day for each additional dwelling;

and

(b)a charge for metered consumption at the rate of 18.9319 cents per unit.

[Clause 9 inserted in Gazette 30 Mar 2009 p. 989; amended in Gazette 26 Mar 2010 p. 1136‑7.]

10.Tariff B1 (residential water heating tariff)

(1)Tariff B1 is available for residential water heating during a 6 hour period between the hours of 11.00 p.m. and 6.00 a.m. for installations approved by the corporation. Other single phase hardwired appliances may be connected in conjunction with the water heater.

(2)Tariff B1 comprises —

(a)a fixed charge at the rate of 18.458 cents per day or, for multiple dwellings supplied through one metered supply point, a fixed charge at the rate of 18.458 cents per day for each dwelling; and

(b)a charge for metered consumption at the rate of 10.197 cents per unit.

[Clause 10 inserted in Gazette 30 Mar 2009 p. 990.]

11.Tariff C1 (special community service tariff)

(1)Tariff C1 is available for small voluntary and charitable organisations, subject to the conditions listed in subclause (3).

(2)Tariff C1 comprises —

(a)a fixed charge at the rate of 31.7383 cents per day; and

(b)a charge for metered consumption at the rate of — 

(i)17.3 cents per unit for the first 20 units per day; and

(ii)21.6753 cents for the next 1 630 units per day; and

(iii)19.5586 cents per unit per day for all units exceeding 1 650 units.

(3)Tariff C1 is available subject to the following conditions —

(a)the consumer must be a direct customer of the corporation;

(b)the consumer must be a voluntary, non‑profit making organisation;

(c)the consumer must be endorsed as exempt from income tax under the Income Tax Assessment Act 1997 (Commonwealth) Subdivision 50‑B;

(d)the consumer must provide a public service, which is available to any member of the public without discrimination;

(e)the consumer must not be a Commonwealth, State or local government department, instrumentality or agency;

(f)the consumer must not receive the major part of its funding from any organisation mentioned in paragraph (e).

(4)A consumer seeking supply under Tariff C1 must make an application to the corporation in writing accompanied by evidence which clearly demonstrates that the consumer meets all the conditions listed in subclause (3).

[Clause 11 inserted in Gazette 30 Mar 2009 p. 990‑1; amended in Gazette 26 Mar 2010 p. 1136‑7.]

12.Tariff D1 (special tariff for certain premises)

(1)Tariff D1 is available for premises wholly used by a charitable or benevolent organisation for providing residential accommodation other than for commercial gain, being premises for which Tariff A1 is not available.

(2)Tariff D1 comprises —

(a)a fixed charge at the rate of 31.7383 cents per day; and

(b)if under subclause (3) there is deemed to be more than one equivalent domestic residence in the premises, a charge of 24.6433 cents per day for each equivalent domestic residence except the first that is deemed to be in the premises; and

(c)a charge for metered consumption at the rate of 17.3 cents per unit.

(3)The number of equivalent domestic residences deemed to be in particular premises is ascertained by dividing the facility’s total bed capacity by 5 and, where the quotient is not a whole number, by increasing it to the next highest whole number.

[Clause 12 inserted in Gazette 30 Mar 2009 p. 991‑2; amended in Gazette 26 Mar 2010 p. 1136‑7.]

13.Tariff K1 (general supply with residential tariff)

(1)Tariff K1 is available for premises where the circuit wiring is not separate and the electricity is used partly for general purposes and partly for residential purposes.

(2)Tariff K1 comprises —

(a)a fixed charge at the rate of 34.7537 cents per day; and

(b)a charge for metered consumption at the rate of — 

(i)18.9319 cents per unit for the first 20 units per day; and

(ii)23.7328 cents per unit for the next 1 630 units per day; and

(iii)21.4269 cents per unit per day for all units exceeding 1 650 units.

[Clause 13 inserted in Gazette 30 Mar 2009 p. 992; amended in Gazette 26 Mar 2010 p. 1136‑7.]

14.Tariff W1 (traffic light installations)

Tariff W1 comprises a charge of $4.0192 per day per kW of installed wattage.

[Clause 14 inserted in Gazette 30 Mar 2009 p. 992; amended in Gazette 26 Mar 2010 p. 1136‑7.]

 

Schedule 2 — Street lighting

[bl. 4(2)]

[Heading inserted in Gazette 26 Mar 2010 p. 1137.]

Item

Wattage

Type

Midnight Switch‑off (Obsolescent) Cents per day

1.15 a.m. Switch‑off Cents per day

Dawn Switch‑off Cents per day

Street lighting on current offer and for existing services

Z.01

50

Mercury Vapour

24.3004

24.8207

26.7009

Z.02

80

Mercury Vapour

28.6165

29.2551

32.1877

Z.03

125

Mercury Vapour

35.3923

36.5393

40.678

Z.04

140

Low Pressure Sodium


36.22


37.4025


42.1562

Z.07

250

Mercury Vapour

43.9181

46.153

54.4896

Z.10

400

Mercury Vapour

65.0612

68.4668

81.4743

Z.13

150

High Pressure Sodium


33.5239


34.7537


41.6359

Z.15

250

High Pressure Sodium


49.7005


52.3493


62.5661

Z.18

per kW

Auxiliary Lighting in Public Places


142.3849


150.2958


181.431

Street lighting for existing services only

Z.05

250

Mercury Vapour

56.9138

59.1369

67.4853

Z.06

400

Mercury Vapour

78.0687

81.4743

94.4227

Z.08

250

Mercury Vapour 50% E.C. cost


50.41


52.6095


60.9816

Z.09

250

Mercury Vapour 100% E.C. cost


56.9138


59.1369


67.4853

Z.11

400

Mercury Vapour 50% E.C. cost


71.5649


74.9824


87.9426

Z.12

400

Mercury Vapour 100% E.C. cost


78.0687


81.4743


94.4227

Z.14

150

H.P. Sodium

51.7226

52.9287

59.7872

Z.16

250

H.P. Sodium 50% E.C. cost


59.4325


62.1049


72.2981

Z.17

250

H.P. Sodium 100% E.C. cost


69.1408


71.8487


82.0537

Z.51

60

Incandescent

24.3004

24.8207

26.7009

Z.52

100

Incandescent

24.3004

24.8207

26.7009

Z.53

200

Incandescent

28.6165

29.2551

32.1877

Z.54

300

Incandescent

35.3923

36.5393

40.678

Z.55

500

Incandescent

56.9138

59.1369

67.4853

Z.56

40

Fluorescent

24.3004

24.8207

26.7009

Z.57

80

Fluorescent

28.6165

29.2551

32.1877

Z.58

160

Fluorescent

40.0277

40.5834

47.0872

[Schedule 2 inserted in Gazette 26 Mar 2010 p. 1137-8.]

Schedule 3  Meter rental

[bl. 6(1)]

The rental payable in respect of a subsidiary meter is 15.97 cents per day.

Note:Subsidiary meters are available on application for purposes approved by the corporation.

Schedule 4  Fees

[bl. 7 and 9(5)]

Description of fee

Amount

1.Non‑refundable account establishment fee payable on the establishment or transfer of an account ........


$32.10

2.Three phase residential installation — 

(a)new installation or replacement of single phase meter ...................................................

(b)installation of subsidiary three phase meter (each installation) .........................................

 


$240.40


$148.50

3.Non‑refundable reconnection fee where supply has been terminated for non‑payment of charges or for any other lawful reason ............................................



$29.60

4.Connection to standard public telephone facility where supply not independently metered (per day)


43.6106 cents

5.Temporary supply connection — 

 

(a)single phase (overhead) ................................

$300.00

(b)three phase (overhead) ..................................

$600.00

6.Meter testing — 

 

(a)standard meter testing fee .............................

$152.00

(b)reduced meter testing fee ..............................

$139.80

7.Disconnection of overhead service leads following unauthorised reconnection .......................................


$190.00

8.Meter reading where reading requested by consumer ..................................................................


$19.20

9.Supply of electricity to standard railway crossing lights (per day) .........................................................


55.7313 cents

10.Overdue account notices ..........................................

$4.40

11.Tariff R1 or R3 “time‑of‑use meter” installation fee ............................................................................


$709.00

[Schedule 4 amended in Gazette 26 Jun 2007 p. 3017; 30 Mar 2009 p. 982 and 994; 26 Mar 2010 p. 1138.]

dline

 

Notes

1This is a compilation of the Energy Operators (Electricity Retail Corporation) (Charges) By-laws 2006 and includes the amendments made by the other written laws referred to in the following table 1a. The table also contains information about any reprint.

Compilation table

Citation

Gazettal

Commencement

Energy Operators (Electricity Retail Corporation) (Charges) By‑laws 2006

31 Mar 2006 p. 1225‑46

1 Apr 2006 (see bl. 2)

Energy Operators (Electricity Retail Corporation) (Charges) Amendment By‑laws 2006

1 Dec 2006 p. 5349‑50

1 Dec 2006

Energy Operators (Electricity Retail Corporation) (Charges) Amendment By‑laws 2007

26 Jun 2007 p. 3013‑17

bl. 1 and 2: 26 Jun 2007 (see bl. 2(a));
By
‑laws other than bl. 1 and 2: 1 Jul 2007 (see bl. 2(b))

Energy Operators (Electricity Retail Corporation) (Charges) Amendment By‑laws 2009

30 Mar 2009 p. 967‑95

bl. 1 and 2: 30 Mar 2009 (see bl. 2(a));
bl. 3 and Pt. 2: 1 Apr 2009 (see bl. 2(b));
Pt. 3: 1 Jul 2009 (see bl. 2(c))

Reprint 1: The Energy Operators (Electricity Retail Corporation) (Charges) By‑laws 2006 as at 18 Sep 2009 (includes amendments listed above)

Energy Operators (Electricity Retail Corporation) (Charges) Amendment By‑laws 2010

26 Mar 2010 p. 1135-42

Pt. 1: 26 Mar 2010 (see bl. 2(a));
Pt. 2: 1 Apr 2010 (see bl. 2(b))

1aOn the date as at which this compilation was prepared, provisions referred to in the following table had not come into operation and were therefore not included in this compilation. For the text of the provisions see the endnotes referred to in the table.

Provisions that have not come into operation

Citation

Gazettal

Commencement

Energy Operators (Electricity Retail Corporation) (Charges) Amendment By‑laws 2010 Pt. 3 2

26 Mar 2010 p. 1135-42

1 Jul 2010 (see bl. 2(c))

2On the date as at which this compilation was prepared, the Energy Operators (Electricity Retail Corporation) (Charges) Amendment By‑laws 2010 Pt. 3 had not come into operation. It reads as follows:

 

Part 3  Amendments commencing on 1 July 2010

8.Schedule 1 amended

Amend the provisions listed in the Table as set out in the Table.

Table

Provision

Delete

Insert

Sch. 1 cl. 1(2)(a)

32.98

36.278

Sch. 1 cl. 1(2)(b)

21.6753

19.5586

23.8428

21.5145

Sch. 1 cl. 2(2)(a)

34.5527

38.008

Sch. 1 cl. 2(2)(b)

22.704

20.4928

24.9744

22.5421

Sch. 1 cl. 3(2)(a)

34.5527

38.008

Sch. 1 cl. 3(2)(b)

21.9354

19.7005

24.1289

21.6706

Sch. 1 cl. 4(1)(a)

$1.3521

$1.4873

Sch. 1 cl. 4(1)(b)

23.7328

7.3197

26.1061

8.0517

Sch. 1 cl. 5(1)(a)

$1.6257

$1.7883

Sch. 1 cl. 5(1)(b)

28.4628

8.7624

31.3091

9.6386

Sch. 1 cl. 6(2)(a)

$349.1133

$356.0955

Sch. 1 cl. 6(2)(b)

88.6765

90.45

Sch. 1 cl. 6(2)(c)

12.6877

8.0271

12.9415

8.1876

Sch. 1 cl. 7(2)(a)

$475.6062

$499.3865

Sch. 1 cl. 7(2)(b)

83.792

87.9815

Sch. 1 cl. 7(2)(c)

12.2507

8.1475

12.8633

8.5548

Sch. 1 cl. 9(2)(a)

34.7537 (each occurrence)

26.9847

38.2291

 

29.6832

Sch. 1 cl. 9(2)(b)

18.9319

20.8251

Sch. 1 cl. 10(2)(a)

18.458 (each occurrence)

19.8054

Sch. 1 cl. 10(2)(b)

10.197

10.9414

Sch. 1 cl. 11(2)(a)

31.7383

34.9121

Sch. 1 cl. 11(2)(b)

17.3

21.6753

19.5586

19.03

23.8428

21.5145

Sch. 1 cl. 12(2)(a)

31.7383

34.9121

Sch. 1 cl. 12(2)(b)

24.6433

27.1076

Sch. 1 cl. 12(2)(c)

17.3

19.03

Sch. 1 cl. 13(2)(a)

34.7537

38.2291

Sch. 1 cl. 13(2)(b)

18.9319

23.7328

21.4269

20.8251

26.1061

23.5696

9.Schedule 2 replaced

Delete Schedule 2 and insert:

 

Schedule 2 — Street lighting

[bl. 4(2)]

Item

Wattage

Type

Midnight Switch‑off (Obsolescent) Cents per day

1.15 a.m. Switch‑off Cents per day

Dawn Switch‑off Cents per day

Street lighting on current offer and for existing services

Z.01

50

Mercury Vapour

26.7304

27.3028

29.371

Z.02

80

Mercury Vapour

31.4782

32.1806

35.4065

Z.03

125

Mercury Vapour

38.9315

40.1932

44.7458

Z.04

140

Low Pressure Sodium


39.842


41.1428


46.3718

Z.07

250

Mercury Vapour

48.3099

50.7683

59.9386

Z.10

400

Mercury Vapour

71.5673

75.3135

89.6217

Z.13

150

High Pressure Sodium


36.8763


38.2291


45.7995

Z.15

250

High Pressure Sodium


54.6706


57.5842


68.8227

Z.18

per kW

Auxiliary Lighting in Public Places


156.6234


165.3254


199.5741

Street lighting for existing services only

Z.05

250

Mercury Vapour

62.6052

65.0506

74.2338

Z.06

400

Mercury Vapour

85.8756

89.6217

103.865

Z.08

250

Mercury Vapour 50% E.C. cost


55.451


57.8705


67.0798

Z.09

250

Mercury Vapour 100% E.C. cost


62.6052


65.0506


74.2338

Z.11

400

Mercury Vapour 50% E.C. cost


78.7214


82.4806


96.7369

Z.12

400

Mercury Vapour 100% E.C. cost


85.8756


89.6217


103.865

Z.14

150

H.P. Sodium

56.8949

58.2216

65.7659

Z.16

250

H.P. Sodium 50% E.C. cost


65.3758


68.3154


79.5279

Z.17

250

H.P. Sodium 100% E.C. cost


76.0549


79.0336


90.2591

Z.51

60

Incandescent

26.7304

27.3028

29.371

Z.52

100

Incandescent

26.7304

27.3028

29.371

Z.53

200

Incandescent

31.4782

32.1806

35.4065

Z.54

300

Incandescent

38.9315

40.1932

44.7458

Z.55

500

Incandescent

62.6052

65.0506

74.2338

Z.56

40

Fluorescent

26.7304

27.3028

29.371

Z.57

80

Fluorescent

31.4782

32.1806

35.4065

Z.58

160

Fluorescent

44.0305

44.6417

51.7959

 

10.Schedule 4 amended

Amend the provisions listed in the Table as set out in the Table.

Table

Provision

Delete

Insert

Sch. 4 it. 1

$32.10

$32.80

Sch. 4 it. 2(a)

$240.40

$268.00

Sch 4 it. 3

$29.60

$30.20

Sch 4 it. 4

43.6106

47.9717

Sch 4 it. 7

$190.00

$194.00

Sch 4 it. 8

$19.20

$19.60

Sch. 4 it. 9

55.7313

61.3044

Sch. 4 it. 10

$4.40

$4.50

Sch. 4 it. 11

$709.00

$786.00

 

 

 

 

Defined Terms

 

[This is a list of terms defined and the provisions where they are defined. The list is not part of the law.]

Defined TermProvision(s)

corporation3

dwelling3

eligible person9(1)

half‑hourly maximum demand3

interest period12(1)

off peak3

on peak3

RBA cash rate3

relevant period8(1)

residential tariff3

standard time3A(1)

summer time3A(1)

Tariff3

unit3