Energy Operators (Powers) Act 1979
Energy Operators (Regional Power Corporation) (Charges) By-laws 2006
Western Australia
Energy Operators (Regional Power Corporation) (Charges) By-laws 2006
CONTENTS
1.Citation1
2.Commencement1
3.Terms used1
4.Electricity charges2
5.Application of residential tariffs2
6.Meter rental2
7.Fees3
8.Payment3
9.Rebates and reduced fees3
10.Calculation of charges5
11.Changes in rates5
12.Prescribed rate of interest for s. 62(16) of the Act5
Schedule 1 — Supply charges
1.Terms used7
2.Tariff L2 (general supply — low/medium voltage tariff)7
3.Tariff L4 (general supply — low/medium voltage tariff)7
4.Tariff M2 (general supply — high voltage tariff)8
5.Tariff N2 (regional non‑integrated systems — cost of supply tariff)8
6.Tariff P2 (North West interconnected system — cost of supply tariff)9
7.Tariff A2 (residential tariff)9
8.Tariff C2 (special community service tariff)10
9.Tariff D2 (special tariff for certain premises)11
10.Tariff K2 (general supply with residential tariff)11
11.Tariff W2 (traffic light installations)12
Schedule 2 — Street lighting
Schedule 3 — Meter rentals
Schedule 4 — Fees
Notes
Compilation table18
Provisions that have not come into operation18
Defined Terms
Western Australia
Energy Operators (Powers) Act 1979
Energy Operators (Regional Power Corporation) (Charges) By‑laws 2006
These by‑laws are the Energy Operators (Regional Power Corporation) (Charges) By‑laws 2006 1.
These by‑laws come into operation on 1 April 2006.
In these by‑laws, unless the contrary intention appears —
corporation means the body established by the Electricity Corporations Act 2005 section 4(1)(d);
dwelling means a house, flat, home unit or other place of residence used solely for residential purposes;
RBA cash rate means the percentage (or maximum percentage) specified by the Reserve Bank of Australia as the Cash Rate Target;
residential tariff means Tariff A2;
Tariff followed by a designation means the tariff so designated in Schedule 1;
unit, in relation to a charge for electricity, means one kilowatt hour.
[By‑law 3 amended in Gazette 30 Mar 2009 p. 1000.]
(1)The charges to be paid by consumers for electricity supplied by the corporation are those specified in, or calculated in accordance with, Schedule 1.
(2)The charges to be paid by consumers for street lighting supplied by the corporation are those specified in Schedule 2.
5.Application of residential tariffs
(1)A consumer is entitled to be supplied on the basis of the residential tariff only if —
(a)the premises supplied consist of a dwelling; and
(b)the supply is not used for any industrial, commercial, business, or general purpose.
(2)Notwithstanding that any premises would not otherwise be treated as a dwelling for the purposes of this by‑law, the residential tariff may be applied if the premises or any part of the premises is independently supplied and separately metered solely for the purpose of a residential supply.
(1)A consumer supplied by the corporation with electricity is liable to pay the rental specified in Schedule 3 in respect of each subsidiary meter used to meter the supply.
(2)Sub‑bylaw (1) does not apply to a consumer if —
(a)the premises supplied consist of a dwelling;
(b)the supply is not used for any industrial, commercial, business, or general purpose; and
(c)the master account is supplied under the residential tariff.
The fees specified in Schedule 4 are payable in respect of the matters specified in that Schedule.
(1)In this by‑law —
relevant period means —
(a)in the case of a consumer to whom the Code of Conduct for the Supply of Electricity to Small Use Customers applies, the period ending on the due date for payment as specified by the corporation; and
(b)in any other case, the period of 14 days after payment is requested by the corporation.
(2)A consumer supplied by the corporation must pay the appropriate charges specified in the Schedules within the relevant period.
(3)Subject to the Act section 124(4a), if payment of a charge exceeding $1 000 is not made in full within the relevant period, the consumer must pay an additional amount by way of interest for each day that the charge remains unpaid at a rate that is equal to the RBA cash rate as at that day increased by 6 percentage points.
(4)An amount payable under sub‑bylaw (2) or (3) is recoverable in any court of competent jurisdiction as a debt due to the corporation.
[By‑law 8 amended in Gazette 30 Mar 2009 p. 1000.]
(1)In this by‑law —
eligible person means a person who satisfies the corporation that the person holds —
(a)a —
(i)Health Care Card;
(ii)Commonwealth seniors health card; or
(iii)Pensioner Concession Card,
issued by the Department of Social Security of the Government of the Commonwealth;
(b)a Repatriation Health Card, issued by the Department of Veterans’ Affairs of the Government of the Commonwealth, that indicates on it that the person is totally and permanently incapacitated, a war widow or a dependant; or
(c)a Seniors’ Card issued by the Office of Seniors’ Interests of the Government of the State.
(2)Where electricity is supplied to a consumer who is an eligible person, for use at his or her principal place of residence and the consumer is charged on the basis of Tariff A2, the consumer is entitled to a rebate equal to the fixed charge payable under that tariff for that residence.
(3)Where a consumer who is charged on the basis of Tariff A2 for electricity supplied by the corporation satisfies the corporation that electricity supplied to the consumer has been delivered to and used at premises occupied by an eligible person as his or her principal place of residence, the consumer is entitled to a rebate equal to the fixed charge payable under that tariff for those premises.
(4)Where a fixed charge is payable for multiple dwellings and there is a dwelling in respect of which the rebate is not payable, for the purposes of ascertaining the amount of the rebate payable the amount of the fixed charge payable in respect of the first dwelling shall be taken to relate to a dwelling in respect of which a rebate is not payable.
(5)A person who comes within paragraph (a) or (b) of the definition of eligible person in sub‑bylaw (1) and who is entitled to a rebate under this by‑law is also —
(a)exempted from payment of the account establishment fee specified in Schedule 4 item 1; and
(b)entitled to pay the reduced meter testing fee specified in Schedule 4 item 6(b).
(1)Where a charge per unit specified in Schedule 1 depends on the number of units consumed per day the charge per unit is to be based on the average daily consumption in the accounting period.
(2)Where, for the purpose of ascertaining a charge under Tariff N2, a rate in cents per unit is to be calculated in accordance with a formula, the rate is to be rounded to the nearest one hundredth of one cent except where an amount calculated falls halfway between 2 consecutive one hundredths of one cent, in which case the rate is to be rounded to the nearest even one hundredth of one cent.
(3)Where a charge calculated in accordance with a Schedule is an amount which is not a whole number multiple of 5 cents the amount is to be rounded up or down, as the case may be, to the nearest whole number multiple of 5 cents.
Where during any accounting period a change in the applicable rate of charges occurs, the charge payable may be adjusted by reference to the date on which the change is to take effect or by reference to the date on which the change is applied to any applicable account, whichever results in the lower charge.
12.Prescribed rate of interest for s. 62(16) of the Act
(1)In this by‑law —
interest period means the period in respect of which payment is made or credit is given.
(2)For the purposes of section 62(16) of the Act, the rate at which interest is to be paid, or given credit for, by the corporation is —
(a)the rate that is equal to the RBA cash rate for the interest period; or
(b)if there is more than one RBA cash rate for the interest period — the rate that is equal to the average of the RBA cash rates for that period.
[By‑law 12 inserted in Gazette 30 Mar 2009 p. 1000‑1.]
[bl. 3, 4(1) and 10(1)]
[Heading inserted in Gazette 26 Mar 2010 p. 1172.]
In this Schedule —
North West interconnected system has the meaning given in the Electricity Transmission and Distribution Systems (Access) Act 1994 section 3;
regional non‑integrated system means any electrical system of or conducted by the corporation from which electricity is supplied to consumers, other than the South West interconnected system and the North West interconnected system;
South West interconnected system has the meaning given in the Electricity Industry Act 2004 section 3.
[Clause 1 inserted in Gazette 26 Mar 2010 p. 1172.]
2.Tariff L2 (general supply — low/medium voltage tariff)
(1)Tariff L2 is available for low/medium voltage supply.
(2)Tariff L2 comprises —
(a)a fixed charge at the rate of 32.98 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)21.6753 cents per unit for the first 1 650 units per day; and
(ii)19.5586 cents per unit for all units exceeding 1 650 units per day.
(3)Tariff L2 is available subject to the condition that the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be less than 50 megawatt hours per annum.
[Clause 2 inserted in Gazette 26 Mar 2010 p. 1172-3.]
3.Tariff L4 (general supply — low/medium voltage tariff)
(1)Tariff L4 is available for low/medium voltage supply.
(2)Tariff L4 comprises —
(a)a fixed charge at the rate of 34.5527 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)22.704 cents per unit for the first 1 650 units per day; and
(ii)20.4928 cents per unit for all units exceeding 1 650 units per day.
(3)Tariff L4 is available subject to the condition that the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be 50 megawatt hours or more per annum.
[Clause 3 inserted in Gazette 26 Mar 2010 p. 1173.]
4.Tariff M2 (general supply — high voltage tariff)
(1)Tariff M2 is available for consumers supplied at 6.6 kV, 11 kV, 22 kV or 33 kV or such higher voltage as the corporation may approve.
(2)Tariff M2 comprises —
(a)a fixed charge at the rate of 34.5527 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)21.9354 cents per unit for the first 1 650 units per day; and
(ii)19.7005 cents per unit per day for all units exceeding 1 650 units.
[Clause 4 inserted in Gazette 26 Mar 2010 p. 1173.]
5.Tariff N2 (regional non‑integrated systems — cost of supply tariff)
(1)Tariff N2 applies to electricity supplied from a regional non‑integrated system to Commonwealth or foreign government instrumentalities.
(2)Tariff N2 comprises —
(a)a fixed charge at the rate of 31.31 cents per day; and
(b)a charge for metered consumption at the rate (in cents per unit) calculated in accordance with the following formula and by‑law 10(2) —
Where —
R is the rate to be calculated; and
P is the Singapore Gas Oil 0.5%S midpoint of the Product Price Assessments for Singapore/Japan Cargoes —
(i)as amended from time to time and published by Platt’s in the Oilgram Price Report; and
(ii)as expressed in Australian dollars per litre and including the rate of duty imposed by item 10.10 of the Schedule to the Excise Tariff Act 1921 (Commonwealth).
[Clause 5 inserted in Gazette 26 Mar 2010 p. 1174.]
6.Tariff P2 (North West interconnected system — cost of supply tariff)
(1)Tariff P2 applies to electricity supplied from the North West interconnected system to Commonwealth or foreign government instrumentalities.
(2)Tariff P2 comprises —
(a)a fixed charge at the rate of 40.7318 cents per day; and
(b)a charge for metered consumption at the rate of 27.0148 cents per unit.
[Clause 6 inserted in Gazette 26 Mar 2010 p. 1174-5.]
7.Tariff A2 (residential tariff)
(1)Tariff A2 is available for residential use only.
(2)Tariff A2 comprises —
(a)a fixed charge at the rate of 34.7537 cents per day or, for multiple dwellings supplied through one metered supply point, a fixed charge at the rate of —
(i)34.7537 cents per day for the first dwelling; and
(ii)26.9847 cents per day for each additional dwelling;
and
(b)a charge for metered consumption at the rate of 18.9319 cents per unit.
[Clause 7 inserted in Gazette 26 Mar 2010 p. 1175.]
8.Tariff C2 (special community service tariff)
(1)Tariff C2 is available for small voluntary and charitable organisations, subject to the conditions listed in subclause (3).
(2)Tariff C2 comprises —
(a)a fixed charge at the rate of 31.7383 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)17.3 cents per unit for the first 20 units per day; and
(ii)21.6753 cents for the next 1 630 units per day; and
(iii)19.5586 cents per unit per day for all units exceeding 1 650 units.
(3)Tariff C2 is available subject to the following conditions —
(a)the consumer must be a direct customer of the corporation;
(b)the consumer must be a voluntary, non‑profit making organisation;
(c)the consumer must be endorsed as exempt from income tax under the Income Tax Assessment Act 1997 (Commonwealth) Subdivision 50‑B;
(d)the consumer must provide a public service, which is available to any member of the public without discrimination;
(e)the consumer must not be a Commonwealth, State or local government department, instrumentality or agency;
(f)the consumer must not receive the major part of its funding from any organisation mentioned in paragraph (e).
(4)A consumer seeking supply under Tariff C2 must make an application to the corporation in writing accompanied by evidence which clearly demonstrates that the consumer meets all the conditions listed in subclause (3).
[Clause 8 inserted in Gazette 26 Mar 2010 p. 1175-6.]
9.Tariff D2 (special tariff for certain premises)
(1)Tariff D2 is available for premises wholly used by a charitable or benevolent organisation for providing residential accommodation other than for commercial gain, being premises for which Tariff A2 is not available.
(2)Tariff D2 comprises —
(a)a fixed charge at the rate of 31.7383 cents per day; and
(b)if under subclause (3) there is deemed to be more than one equivalent domestic residence in the premises, a charge of 24.6433 cents per day for each equivalent domestic residence except the first that is deemed to be in the premises; and
(c)a charge for metered consumption at the rate of 17.3 cents per unit.
(3)The number of equivalent domestic residences deemed to be in particular premises is ascertained by dividing the facility’s total bed capacity by 5 and, where the quotient is not a whole number, by increasing it to the next highest whole number.
[Clause 9 inserted in Gazette 26 Mar 2010 p. 1176-7.]
10.Tariff K2 (general supply with residential tariff)
(1)Tariff K2 is available for premises where the circuit wiring is not separate and the electricity is used partly for general purposes and partly for residential purposes.
(2)Tariff K2 comprises —
(a)a fixed charge at the rate of 34.7537 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)18.9319 cents per unit for the first 20 units per day; and
(ii)23.7328 cents per unit for the next 1 630 units per day; and
(iii)21.4269 cents per unit per day for all units exceeding 1 650 units.
[Clause 10 inserted in Gazette 26 Mar 2010 p. 1177.]
11.Tariff W2 (traffic light installations)
Tariff W2 comprises a charge of $4.0192 per day per kW of installed wattage.
[Clause 11 inserted in Gazette 26 Mar 2010 p. 1177.]
[bl. 4(2)]
[Heading inserted in Gazette 26 Mar 2010 p. 1177.]
Item |
Wattage |
Type |
Midnight Switch‑off (Obsolescent) Cents per day |
1.15 a.m. Switch‑off Cents per day |
Dawn Switch‑off Cents per day |
Street lighting on current offer and for existing services |
|||||
Z.01 |
50 |
Mercury Vapour |
24.3004 |
24.8207 |
26.7009 |
Z.02 |
80 |
Mercury Vapour |
28.6165 |
29.2551 |
32.1877 |
Z.03 |
125 |
Mercury Vapour |
35.3923 |
36.5393 |
40.678 |
Z.04 |
140 |
Low Pressure Sodium |
|
|
|
Z.07 |
250 |
Mercury Vapour |
43.9181 |
46.153 |
54.4896 |
Z.10 |
400 |
Mercury Vapour |
65.0612 |
68.4668 |
81.4743 |
Z.13 |
150 |
High Pressure Sodium |
|
|
|
Z.15 |
250 |
High Pressure Sodium |
|
|
|
Z.18 |
per kW |
Auxiliary Lighting in Public Places |
|
|
|
Street lighting for existing services only |
|||||
Z.05 |
250 |
Mercury Vapour |
56.9138 |
59.1369 |
67.4853 |
Z.06 |
400 |
Mercury Vapour |
78.0687 |
81.4743 |
94.4227 |
Z.08 |
250 |
Mercury Vapour 50% E.C. cost |
|
|
|
Z.09 |
250 |
Mercury Vapour 100% E.C. cost |
|
|
|
Z.11 |
400 |
Mercury Vapour 50% E.C. cost |
|
|
|
Z.12 |
400 |
Mercury Vapour 100% E.C. cost |
|
|
|
Z.14 |
150 |
H.P. Sodium |
51.7226 |
52.9287 |
59.7872 |
Z.16 |
250 |
H.P. Sodium 50% E.C. cost |
|
|
|
Z.17 |
250 |
H.P. Sodium 100% E.C. cost |
|
|
|
Z.51 |
60 |
Incandescent |
24.3004 |
24.8207 |
26.7009 |
Z.52 |
100 |
Incandescent |
24.3004 |
24.8207 |
26.7009 |
Z.53 |
200 |
Incandescent |
28.6165 |
29.2551 |
32.1877 |
Z.54 |
300 |
Incandescent |
35.3923 |
36.5393 |
40.678 |
Z.55 |
500 |
Incandescent |
56.9138 |
59.1369 |
67.4853 |
Z.56 |
40 |
Fluorescent |
24.3004 |
24.8207 |
26.7009 |
Z.57 |
80 |
Fluorescent |
28.6165 |
29.2551 |
32.1877 |
Z.58 |
160 |
Fluorescent |
40.0277 |
40.5834 |
47.0872 |
[Schedule 2 inserted in Gazette 26 Mar 2010 p. 1177-9.]
[bl. 6(1)]
The rental payable in respect of a subsidiary meter is 15.97 cents per day.
Note:Subsidiary meters are available on application for purposes approved by the corporation.
[bl. 7 and 9(5)]
|
Description of fee |
Amount |
1. |
Non‑refundable account establishment fee payable on the establishment or transfer of an account ................................................................. |
|
2. |
Three phase residential installation — (a)new installation or replacement of single phase meter ............................................. (b)installation of subsidiary three phase meter (each installation) ......................... |
|
3. |
Non‑refundable reconnection fee where supply has been terminated for non‑payment of charges or for any other lawful reason ............................... |
|
4. |
Connection to standard public telephone facility where supply not independently metered (per day) ................................................................ |
|
5. |
Temporary supply connection — (a)single phase (overhead) ......................... (b)three phase (overhead) ........................... |
$300.00 $600.00 |
6. |
Meter testing — (a)standard meter testing fee ....................... (b)reduced meter testing fee ....................... |
$152.00 $139.80 |
7. |
Disconnection of overhead service leads following unauthorised reconnection .................... |
|
8. |
Meter reading where reading requested by consumer ............................................................... |
|
9. |
Supply of electricity to standard railway crossing lights (per day) ...................................................... |
|
10. |
Overdue account notices ....................................... |
$4.40 |
11. |
Rejected account payment (where payment made through Australia Post) ......................................... |
|
[Schedule 4 amended in Gazette 29 Jun 2007 p. 3193; 30 Mar 2009 p. 1008 and 1016‑17; 26 Mar 2010 p. 1179.]
1This is a compilation of the Energy Operators (Regional Power Corporation) (Charges) By-laws 2006 and includes the amendments made by the other written laws referred to in the following table. The table also contains information about any reprint.
Citation |
Gazettal |
Commencement |
Energy Operators (Regional Power Corporation) (Charges) By‑laws 2006 |
31 Mar 2006 p. 1279‑97 |
1 Apr 2006 (see bl. 2) |
Energy Operators (Regional Power Corporation) (Charges) Amendment By‑law 2007 |
29 Jun 2007 p. 3192‑3 |
bl. 1 and 2: 29 Jun 2007 (see bl. 2(a)); |
Energy Operators (Regional Power Corporation) (Charges) Amendment By‑laws 2009 |
30 Mar 2009 p. 997‑1017 |
bl. 1 and 2: 30 Mar 2009 (see bl. 2(a)); |
Reprint 1: The Energy Operators (Regional Power Corporation) (Charges) By‑laws 2006 as at 16 Oct 2009 (includes amendments listed above) |
||
Energy Operators (Regional Power Corporation) (Charges) Amendment By‑laws 2010 |
26 Mar 2010 p. 1171-89 |
Pt. 1: 26 Mar 2010 (see bl. 2(a)); |
1aOn the date as at which this compilation was prepared, provisions referred to in the following table had not come into operation and were therefore not included in this compilation. For the text of the provisions see the endnotes referred to in the table.
Provisions that have not come into operation
Citation |
Gazettal |
Commencement |
Energy Operators (Regional Power Corporation) (Charges) Amendment By‑laws 2010 Pt. 3 2 |
26 Mar 2010 p. 1171-89 |
1 Jul 2010 (see bl. 2(c)) |
2On the date as at which this compilation was prepared, the Energy Operators (Regional Power Corporation) (Charges) Amendment By‑laws 2010 Pt. 3 had not come into operation. It reads as follows:
Part 3 — Amendments commencing on 1 July 2010
7.Schedule 1 replaced
Delete Schedule 1 and insert:
Schedule 1 — Supply charges
[bl. 3, 4(1) and 10(1)]
1.Terms used
In this Schedule —
North West interconnected system has the meaning given in the Electricity Transmission and Distribution Systems (Access) Act 1994 section 3;
regional non‑integrated system means any electrical system of or conducted by the corporation from which electricity is supplied to consumers, other than the South West interconnected system and the North West interconnected system;
South West interconnected system has the meaning given in the Electricity Industry Act 2004 section 3.
2.Tariff L2 (general supply — low/medium voltage tariff)
(1)Tariff L2 is available for low/medium voltage supply.
(2)Tariff L2 comprises —
(a)a fixed charge at the rate of 36.278 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)23.8428 cents per unit for the first 1 650 units per day; and
(ii)21.5145 cents per unit for all units exceeding 1 650 units per day.
(3)Tariff L2 is available subject to the condition that the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be less than 50 megawatt hours per annum.
3.Tariff L4 (general supply — low/medium voltage tariff)
(1)Tariff L4 is available for low/medium voltage supply.
(2)Tariff L4 comprises —
(a)a fixed charge at the rate of 38.008 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)24.9744 cents per unit for the first 1 650 units per day; and
(ii)22.5421 cents per unit for all units exceeding 1 650 units per day.
(3)Tariff L4 is available subject to the condition that the consumer satisfies the corporation that the amount of electricity supplied to the consumer’s premises will be 50 megawatt hours or more per annum.
4.Tariff M2 (general supply — high voltage tariff)
(1)Tariff M2 is available for consumers supplied at 6.6 kV, 11 kV, 22 kV or 33 kV or such higher voltage as the corporation may approve.
(2)Tariff M2 comprises —
(a)a fixed charge at the rate of 38.008 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)24.1289 cents per unit for the first 1 650 units per day; and
(ii)21.6706 cents per unit per day for all units exceeding 1 650 units.
5.Tariff N2 (regional non‑integrated systems — cost of supply tariff)
(1)Tariff N2 applies to electricity supplied from a regional non‑integrated system to Commonwealth or foreign government instrumentalities.
(2)Tariff N2 comprises —
(a)a fixed charge at the rate of 31.31 cents per day; and
(b)a charge for metered consumption at the rate (in cents per unit) calculated in accordance with the following formula and by‑law 10(2) —
Where —
R is the rate to be calculated; and
P is the Singapore Gas Oil 0.5%S midpoint of the Product Price Assessments for Singapore/Japan Cargoes —
(i)as amended from time to time and published by Platt’s in the Oilgram Price Report; and
(ii)as expressed in Australian dollars per litre and including the rate of duty imposed by item 10.10 of the Schedule to the Excise Tariff Act 1921 (Commonwealth).
6.Tariff P2 (North West interconnected system — cost of supply tariff)
(1)Tariff P2 applies to electricity supplied from the North West interconnected system to Commonwealth or foreign government instrumentalities.
(2)Tariff P2 comprises —
(a)a fixed charge at the rate of 44.8049 cents per day; and
(b)a charge for metered consumption at the rate of 29.7162 cents per unit.
7.Tariff A2 (residential tariff)
(1)Tariff A2 is available for residential use only.
(2)Tariff A2 comprises —
(a)a fixed charge at the rate of 38.2291 cents per day or, for multiple dwellings supplied through one metered supply point, a fixed charge at the rate of —
(i)38.2291 cents per day for the first dwelling; and
(ii)29.6832 cents per day for each additional dwelling;
and
(b)a charge for metered consumption at the rate of 20.8251 cents per unit.
8.Tariff C2 (special community service tariff)
(1)Tariff C2 is available for small voluntary and charitable organisations, subject to the conditions listed in subclause (3).
(2)Tariff C2 comprises —
(a)a fixed charge at the rate of 34.9121 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)19.03 cents per unit for the first 20 units per day; and
(ii)23.8428 cents for the next 1 630 units per day; and
(iii)21.5145 cents per unit per day for all units exceeding 1 650 units.
(3)Tariff C2 is available subject to the following conditions —
(a)the consumer must be a direct customer of the corporation;
(b)the consumer must be a voluntary, non‑profit making organisation;
(c)the consumer must be endorsed as exempt from income tax under the Income Tax Assessment Act 1997 (Commonwealth) Subdivision 50‑B;
(d)the consumer must provide a public service, which is available to any member of the public without discrimination;
(e)the consumer must not be a Commonwealth, State or local government department, instrumentality or agency;
(f)the consumer must not receive the major part of its funding from any organisation mentioned in paragraph (e).
(4)A consumer seeking supply under Tariff C2 must make an application to the corporation in writing accompanied by evidence which clearly demonstrates that the consumer meets all the conditions listed in subclause (3).
9.Tariff D2 (special tariff for certain premises)
(1)Tariff D2 is available for premises wholly used by a charitable or benevolent organisation for providing residential accommodation other than for commercial gain, being premises for which Tariff A2 is not available.
(2)Tariff D2 comprises —
(a)a fixed charge at the rate of 34.9121 cents per day; and
(b)if under subclause (3) there is deemed to be more than one equivalent domestic residence in the premises, a charge of 27.1076 cents per day for each equivalent domestic residence except the first that is deemed to be in the premises; and
(c)a charge for metered consumption at the rate of 19.03 cents per unit.
(3)The number of equivalent domestic residences deemed to be in particular premises is ascertained by dividing the facility’s total bed capacity by 5 and, where the quotient is not a whole number, by increasing it to the next highest whole number.
10.Tariff K2 (general supply with residential tariff)
(1)Tariff K2 is available for premises where the circuit wiring is not separate and the electricity is used partly for general purposes and partly for residential purposes.
(2)Tariff K2 comprises —
(a)a fixed charge at the rate of 38.2291 cents per day; and
(b)a charge for metered consumption at the rate of —
(i)20.8251 cents per unit for the first 20 units per day; and
(ii)26.1061 cents per unit for the next 1 630 units per day; and
(iii)23.5696 cents per unit per day for all units exceeding 1 650 units.
11.Tariff W2 (traffic light installations)
Tariff W2 comprises a charge of $4.0192 per day per kW of installed wattage.
8.Schedule 2 replaced
Delete Schedule 2 and insert:
Schedule 2 — Street lighting
[bl. 4(2)]
Item |
Wattage |
Type |
Midnight Switch‑off (Obsolescent) Cents per day |
1.15 a.m. Switch‑off Cents per day |
Dawn Switch‑off Cents per day |
Street lighting on current offer and for existing services |
|||||
Z.01 |
50 |
Mercury Vapour |
26.7304 |
27.3028 |
29.371 |
Z.02 |
80 |
Mercury Vapour |
31.4782 |
32.1806 |
35.4065 |
Z.03 |
125 |
Mercury Vapour |
38.9315 |
40.1932 |
44.7458 |
Z.04 |
140 |
Low Pressure Sodium |
|
|
|
Z.07 |
250 |
Mercury Vapour |
48.3099 |
50.7683 |
59.9386 |
Z.10 |
400 |
Mercury Vapour |
71.5673 |
75.3135 |
89.6217 |
Z.13 |
150 |
High Pressure Sodium |
|
|
|
Z.15 |
250 |
High Pressure Sodium |
|
|
|
Z.18 |
per kW |
Auxiliary Lighting in Public Places |
|
|
|
Street lighting for existing services only |
|||||
Z.05 |
250 |
Mercury Vapour |
62.6052 |
65.0506 |
74.2338 |
Z.06 |
400 |
Mercury Vapour |
85.8756 |
89.6217 |
103.865 |
Z.08 |
250 |
Mercury Vapour 50% E.C. cost |
|
|
|
Z.09 |
250 |
Mercury Vapour 100% E.C. cost |
|
|
|
Z.11 |
400 |
Mercury Vapour 50% E.C. cost |
|
|
|
Z.12 |
400 |
Mercury Vapour 100% E.C. cost |
|
|
|
Z.14 |
150 |
H.P. Sodium |
56.8949 |
58.2216 |
65.7659 |
Z.16 |
250 |
H.P. Sodium 50% E.C. cost |
|
|
|
Z.17 |
250 |
H.P. Sodium 100% E.C. cost |
|
|
|
Z.51 |
60 |
Incandescent |
26.7304 |
27.3028 |
29.371 |
Z.52 |
100 |
Incandescent |
26.7304 |
27.3028 |
29.371 |
Z.53 |
200 |
Incandescent |
31.4782 |
32.1806 |
35.4065 |
Z.54 |
300 |
Incandescent |
38.9315 |
40.1932 |
44.7458 |
Z.55 |
500 |
Incandescent |
62.6052 |
65.0506 |
74.2338 |
Z.56 |
40 |
Fluorescent |
26.7304 |
27.3028 |
29.371 |
Z.57 |
80 |
Fluorescent |
31.4782 |
32.1806 |
35.4065 |
Z.58 |
160 |
Fluorescent |
44.0305 |
44.6417 |
51.7959 |
9.Schedule 4 replaced
Delete Schedule 4 and insert:
[bl. 7 and 9(5)]
|
Description of fee |
Amount |
1. |
Non‑refundable account establishment fee payable on the establishment or transfer of an account |
|
2. |
Three phase residential installation — (a)new installation or replacement of single phase meter (b)installation of subsidiary three phase meter (each installation) |
|
3. |
Non‑refundable reconnection fee where supply has been terminated for non‑payment of charges or for any other lawful reason |
|
4. |
Connection to standard public telephone facility where supply not independently metered (per day) |
|
5. |
Temporary supply connection — (a)single phase (overhead) (b)three phase (overhead) |
$700.00 $700.00 |
6. |
Meter testing — (a)standard meter testing fee (b)reduced meter testing fee |
$152.00 $139.80 |
7. |
Disconnection of overhead service leads following unauthorised reconnection |
|
8. |
Meter reading where reading requested by consumer |
|
9. |
Supply of electricity to standard railway crossing lights (per day) |
|
10. |
Overdue account notices |
$4.49 |
11. |
Rejected account payment (where payment made through Australia Post) |
|
[This is a list of terms defined and the provisions where they are defined. The list is not part of the law.]
Defined TermProvision(s)
dwelling3
eligible person9(1)
interest period12(1)
North West interconnected systemSch. 1 cl. 1
RBA cash rate3
regional non‑integrated systemSch. 1 cl. 1
relevant period8(1)
residential tariff3
South West interconnected systemSch. 1 cl. 1
Tariff3
unit3